Barrel

barrel.center · BESS Connector

BESS proposals under your brand, in minutes

From project data to technical and commercial proposals in PDF: sizing on the binding constraint, hourly simulation with the site's sun, energy delivered over time from the manufacturer's data, payback on the customer's tariffs. With your logo and your contacts.

Create a free account   Log in

33 manufacturers, 52 systems in the catalogue · Manufacturers' datasheets, kept up to date by the barrel.center comparators

APsystemsBYD Energy StorageCanadian Solar (CSI Energy Storage)CESCDeyeDunextEnergy S.p.A.FIMERFluenceGoodWeGotion High-TechGrowattHithiumHoenergyHuawei Digital PowerHyperStrongJA SolarJinkoSolar (Jinko ESS)KehuaLG Energy Solution VertechLivoltekNarada PowerNidec ConversionPVB (BENY)PylontechREPT BATTEROSamsung SDIsonnenSungrowSuntechWärtsiläWHESZOE Energy Storage
LUNA2000-215
Huawei LUNA2000-215
PowerTitan 3.0
Sungrow PowerTitan 3.0
JA Planet
JA Solar JA Planet
MC Cube-T
BYD MC Cube-T
ESA 125/261
GoodWe ESA 125/261
∞Power 6.25 MWh
Hithium ∞Power 6.25 MWh
PyOcean M9
Pylontech PyOcean M9
JA Galaxy
JA Solar JA Galaxy

Two ways to use it

1

From the website

Log in, set your brand once and fill in the project data: bills, site map, goals. The PDF lands in your profile in a few minutes, from an iPad or a phone too.

Make an offer
2

From Claude

Add the custom connector in Claude and ask for the document in plain words: «Prepare the technical proposal for 4 JA Planet in Prato». Claude uses the same data and the same calculations.

https://mcp.barrel.center/mcp

What it produces

Preliminary analysis

The first answer to the customer, in 2-4 pages: product, size, key figures at commissioning, missing data.

10 credits

Sizing report

Configuration and sizing on the site: hourly simulation, typical days, delivered energy, constraints and data to complete before the offer.

35 credits

Full technical proposal

Up to 18 chapters: project reading, strategy, benefits, sizing, specifications with the status of each value, grid, site, fire safety, warranties.

50 credits

Commercial offer

Your prices; the offer in one page with price, benefit, payback and the status of every figure; expected and warranted, sensitivity and break-even tariff, size alternatives, conditions and signature.

20 credits

Financial model (Excel)

The financial model in Excel for the customer's finance team: hourly energy, benefits, cash flows, editable inputs, checks.

30 credits

Financial summary

One A3 page for the bank or the investment board: NPV, IRR, payback in the four price scenarios, benefit bridge, bill, sensitivity, CO₂, regulatory frame and sources.

15 credits

Financial statement analysis and debt sustainability

Two pages for the customer's bank: its filed statements reclassified, five ratios, and whether the project repays the instalment (DSCR by tenor and debt share). Statements are fetched from the VAT number and included in the price.

80 credits

One-page summary

A3 sheet for the customer's management: six figures, plant, storage, economics.

5 credits

Preliminary fire safety assessment

Elements for the preliminary discussion with the fire authority: framework, layout and distances, measures, product documentation.

35 credits
Full project

Project packages

Offer package · Full technical proposal, Commercial offer, Preliminary fire safety assessment, One-page summary: together at most 90 credits.

Finance package · Financial summary, Financial model (Excel), Financial statement analysis and debt sustainability: together at most 100 credits.

Any other document on the same project −20 %. 3 revisions included within 30 days; an incomplete document comes out as a draft and is not charged.

Examples with test data and a fictitious brand.

Coming soon

More technical documents, on the same product and project data. If you already need one on a real project, write to us: we prepare it with you.

coming soon

Single-line diagram

Electrical diagram of the system and of the connection to the delivery point: storage, PCS, transformer, protections, metering.

coming soon

DXF / DWG drawings

Layout, fire distances and cable routes in CAD format, ready for the designer and the permit.

coming soon

Grid connection documents

Data, diagrams and operating rules for a new or modified connection request to the grid operator.

coming soon

Technical report for permitting

The storage chapters for the simplified procedure, single authorisation or change of an existing plant.

coming soon

MACSE and capacity market dossier

Sizing, guaranteed energy over time and expected revenues to bid in the auctions.

coming soon

Technical specification for tenders

Technical specification and minimum requirements for an EPC or supply tender, brand-neutral.

coming soon

Manufacturer comparison

The same project with systems of different brands: delivered energy, space, warranties, cost per kWh discharged.

coming soon

Testing, commissioning and O&M

FAT/SAT test plan, commissioning checklist and maintenance plan of the system.

Book or ask for information

Inside the documents

Real pages from test proposals: charts and tables come from the connector's calculations, not typed by hand.

Operating strategy: typical summer and winter day
Site balance month by month
Product overview with manufacturer photos
Payback: cash flows and contributions
Parametric layout of utility islands
Guaranteed energy over time and scenarios

barrel.center

Where the data come from

Every figure in the documents has a source. Products, markets and prices come from barrel.center, Barrel's independent observatory on the European battery storage market: the same data published on the website.

Curve Barrel of power prices

Italian national price 2026–2050 in four scenarios, for 7 market zones, with 2, 4 and 8 h spreads, arbitrage value, MACSE and capacity market. Edition 2026 H2. Used in utility offers and market charts.

2550751001251501752026203020342038204220462050€/MWh
Ordered TransitionFragmented WorldPolycrisisSolar Deflation

PUN, month by month

GME prices taken from barrel.center and refreshed every 6 hours · November 2026: 250.7 €/MWh (month average).

2025-11: 117.1 €/MWhNov2025-12: 115.5 €/MWhDec2026-01: 132.7 €/MWhJan2026-02: 114.4 €/MWhFeb2026-03: 143.4 €/MWhMar2026-04: 119.5 €/MWhApr2026-05: 119.3 €/MWhMay2026-06: 132.5 €/MWhJun2026-07: 157.0 €/MWhJul2026-08: 180.0 €/MWhAug2026-09: 207.5 €/MWhSept2026-10: 230.8 €/MWhOct2026-11: 250.7 €/MWhNov

Today's zonal prices · 2026-11-28

NORD219
CNOR219
CSUD219
SUD215
CALA236
SICI246
SARD219

52 systems, 33 manufacturers

Records from the manufacturers' datasheets: energy, power, efficiency, warranties, degradation curves, footprint. Each value carries its status: declared, derived or standard.

C&I comparator →
Utility comparator →

Focus on Italy

F1-F3 time bands, capacity charge, system charges, net metering and feed-in, energy communities, MACSE and capacity market, fire rules for outdoor installations, engineering and connection costs.

250.7€/MWhPUN, month average
66€/MWh4 h spread, 2027
82k€/MW·year4 h arbitrage, 2027
13,094€/MWh·yearMACSE, 2027

Future values from the central scenario of the Curve Barrel (Fragmented World).

F1 · F2 · F3NORD · CNOR · CSUD · SUD · CALA · SICI · SARDMACSECapacity marketCERUVAMCEI 0-16 / 0-21VVF

All of this is on barrel.center

C&I and utility battery storage comparators, BESS markets country by country, the Curve Barrel of Italian power prices. Free and open to everyone.

Go to barrel.center

Pricing

1 credit = 10 € + VAT

Credits per document

Documentcredits€
Preliminary analysis10100
Sizing report35350
Full technical proposal50500
Commercial offer20200
Financial model (Excel)30300
Financial summary15150
Financial statement analysis and debt sustainability80800
One-page summary550
Preliminary fire safety assessment35350
  • Additional documents on the same project: −20 %
  • Offer package: Full technical proposal, Commercial offer, Preliminary fire safety assessment, One-page summary on the same project, at most 90 credits
  • Finance package: Financial summary, Financial model (Excel), Financial statement analysis and debt sustainability on the same project, at most 100 credits
  • 3 revisions included per document within 30 days; then 20 % of the price
  • Incomplete document: delivered as a draft, not charged
  • Connector error: free revision with “report error”
  • 10 welcome credits on sign-up
  • Every version stays in your profile, downloadable

Credit packs

Prova

200 € + VAT
20 credits

Standard

900 € + VAT
100 credits · −10 %

Pro

2.400 € + VAT
300 credits · −20 %

Credits valid 12 months. Pay by bank transfer or by card/SEPA (Stripe).
With a valid pack all calculation tools open in Claude too: site simulation, economic model, sizing, checks.

Create a free account

The documents you produce stay in your profile, visible only to you, and you can delete them at any time. Apart from the documents and the data they are composed from (so you can correct them), your customers' data are not kept.