barrel.center · BESS Connector
From project data to technical and commercial proposals in PDF: sizing on the binding constraint, hourly simulation with the site's sun, energy delivered over time from the manufacturer's data, payback on the customer's tariffs. With your logo and your contacts.



33 manufacturers, 52 systems in the catalogue · Manufacturers' datasheets, kept up to date by the barrel.center comparators









































Log in, set your brand once and fill in the project data: bills, site map, goals. The PDF lands in your profile in a few minutes, from an iPad or a phone too.
Make an offerAdd the custom connector in Claude and ask for the document in plain words: «Prepare the technical proposal for 4 JA Planet in Prato». Claude uses the same data and the same calculations.
https://mcp.barrel.center/mcp

The first answer to the customer, in 2-4 pages: product, size, key figures at commissioning, missing data.

Configuration and sizing on the site: hourly simulation, typical days, delivered energy, constraints and data to complete before the offer.

Up to 18 chapters: project reading, strategy, benefits, sizing, specifications with the status of each value, grid, site, fire safety, warranties.

Your prices; the offer in one page with price, benefit, payback and the status of every figure; expected and warranted, sensitivity and break-even tariff, size alternatives, conditions and signature.

The financial model in Excel for the customer's finance team: hourly energy, benefits, cash flows, editable inputs, checks.
One A3 page for the bank or the investment board: NPV, IRR, payback in the four price scenarios, benefit bridge, bill, sensitivity, CO₂, regulatory frame and sources.
Two pages for the customer's bank: its filed statements reclassified, five ratios, and whether the project repays the instalment (DSCR by tenor and debt share). Statements are fetched from the VAT number and included in the price.

A3 sheet for the customer's management: six figures, plant, storage, economics.

Elements for the preliminary discussion with the fire authority: framework, layout and distances, measures, product documentation.
Offer package · Full technical proposal, Commercial offer, Preliminary fire safety assessment, One-page summary: together at most 90 credits.
Finance package · Financial summary, Financial model (Excel), Financial statement analysis and debt sustainability: together at most 100 credits.
Any other document on the same project −20 %. 3 revisions included within 30 days; an incomplete document comes out as a draft and is not charged.
Examples with test data and a fictitious brand.
More technical documents, on the same product and project data. If you already need one on a real project, write to us: we prepare it with you.
Electrical diagram of the system and of the connection to the delivery point: storage, PCS, transformer, protections, metering.
Layout, fire distances and cable routes in CAD format, ready for the designer and the permit.
Data, diagrams and operating rules for a new or modified connection request to the grid operator.
The storage chapters for the simplified procedure, single authorisation or change of an existing plant.
Sizing, guaranteed energy over time and expected revenues to bid in the auctions.
Technical specification and minimum requirements for an EPC or supply tender, brand-neutral.
The same project with systems of different brands: delivered energy, space, warranties, cost per kWh discharged.
FAT/SAT test plan, commissioning checklist and maintenance plan of the system.
Real pages from test proposals: charts and tables come from the connector's calculations, not typed by hand.






barrel.center
Every figure in the documents has a source. Products, markets and prices come from barrel.center, Barrel's independent observatory on the European battery storage market: the same data published on the website.
Italian national price 2026–2050 in four scenarios, for 7 market zones, with 2, 4 and 8 h spreads, arbitrage value, MACSE and capacity market. Edition 2026 H2. Used in utility offers and market charts.
GME prices taken from barrel.center and refreshed every 6 hours · November 2026: 250.7 €/MWh (month average).
Records from the manufacturers' datasheets: energy, power, efficiency, warranties, degradation curves, footprint. Each value carries its status: declared, derived or standard.




F1-F3 time bands, capacity charge, system charges, net metering and feed-in, energy communities, MACSE and capacity market, fire rules for outdoor installations, engineering and connection costs.
Future values from the central scenario of the Curve Barrel (Fragmented World).
For each country: grid codes, fire safety, tariffs and time bands, market prices, economic assumptions. Italy is complete, the others are being completed country by country.
C&I and utility battery storage comparators, BESS markets country by country, the Curve Barrel of Italian power prices. Free and open to everyone.
1 credit = 10 € + VAT
| Document | credits | € |
|---|---|---|
| Preliminary analysis | 10 | 100 |
| Sizing report | 35 | 350 |
| Full technical proposal | 50 | 500 |
| Commercial offer | 20 | 200 |
| Financial model (Excel) | 30 | 300 |
| Financial summary | 15 | 150 |
| Financial statement analysis and debt sustainability | 80 | 800 |
| One-page summary | 5 | 50 |
| Preliminary fire safety assessment | 35 | 350 |
Credits valid 12 months. Pay by bank transfer or by card/SEPA (Stripe).
With a valid pack all calculation tools open in Claude too: site simulation, economic model, sizing, checks.
The documents you produce stay in your profile, visible only to you, and you can delete them at any time. Apart from the documents and the data they are composed from (so you can correct them), your customers' data are not kept.