barrel.centerBESS markets › Italy

Italy (seven bidding zones) · updated 1 October 2026

In Italy time bands matter little: storage earns on the power charge and on avoided per-kWh charges

The PUN Index differs by less than 2 cents between bands (F1 0.131, F2 0.140, F3 0.122 €/kWh, average September 2025 - August 2026), and per-kWh charges are the same in every band. What weighs is the power charge, 51.20 €/kW/year at low voltage and 44.08 at medium voltage, plus about 0.095 €/kWh of charges and excise avoided by each self-produced, stored kWh.

~131.2 €/MWhaverage day-ahead priceGME · 2025-09..2026-08
n/adaily 4-hour spread
n/ahours at zero or negative price
€51.20LV power charge per kW/year (MV €44.08)e-distribuzione + ARERA · 2026

Prices over the last year

Monthly average day-ahead price, €/MWh. Real history, no forecast.

111
113
120
115
136
116
145
122
120
135
158
184
SeptOctNovDecJanFebMarAprMayJunJulAug

For commercial and industrial sites

Three ARERA time bands (resolution 181/06): F1 on weekdays 8:00-19:00; F2 on weekdays 7:00-8:00 and 19:00-23:00 and on Saturdays 7:00-23:00; F3 at night, on Sundays and on public holidays. Withdrawn energy is priced on the national PUN Index by band, not on the zonal price; regulated per-kWh charges do not change between bands.

Tariff band calendar

01234567891011121314151617181920212223
Weekdays
F3
F3
F3
F3
F3
F3
F3
F2
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F2
F2
F2
F2
F3
Saturday
F3
F3
F3
F3
F3
F3
F3
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F3
Sunday and holidays
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F1F2F3

Regulated charges by band

€/kWhEnergy
F10.131
F20.140
F30.122

€/kWh. Energy: average day-ahead price in the band, last year.

Power charge

The 2026 power charge is 51.20 €/kW/year at low voltage and 44.08 €/kW/year at medium voltage: e-distribuzione transport (32.93 and 28.35) plus ASOS and ARIM system charges (18.27 and 15.73). MV values are for the MTA3 tariff, above 500 kW; the ARIM share is derived by difference.

Value of exported energy

Exported PV is valued at the zonal price, while withdrawals are paid at the national PUN Index. For exports we use an assumption, not a measured figure: 0.7 times the zonal price, because output is concentrated in the midday hours.

PV yield

1,225Nord
1,150 – 1,300
1,400Centro
1,300 – 1,500
1,600Sud
1,500 – 1,700

kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.

For utility-scale storage

Revenue streams open to a storage plant and their status.

MACSEactive

First auction on 30 September 2025: 10 GWh awarded at a weighted average of 12,959 €/MWh-year, delivery from 2028 for 15 years; second auction on 24 November 2026 (about 16 GWh, delivery 2029), with a lower cap proposed by ARERA in DCO 283/2026.

Capacity marketactive

Auctions for 2026 (42.6 GW) and 2027 held; the 2028 auction is expected after the November MACSE auction, with a new derating for BESS (DM 259 of 6 August 2026). Draft data.

Day-ahead arbitrage (MGP)active

GME day-ahead market, at the zonal prices of the seven bidding zones.

Ancillary services (MSD)active

Revenues not yet quantified; draft data.

Rules

Summary of public rules. It does not replace the check of a qualified professional on the specific project.

Grid codeverified

LV: CEI 0-21 (consolidated with V3, October 2025). MV: CEI 0-16 with V5, in force since 1 January 2026 (ARERA resolution 385/2025); at HV, Terna Annex A.79 for storage, plus A.68 where PV is present.

Connection levelverified

Indicatively low voltage (400 V) up to about 500 kW, medium voltage at 10-20 kV, high voltage from 132 kV. The level sets the technical standard and the network tariff; the main DSO is e-distribuzione.

Registry and zonesverified

Plants are registered in Terna's Gaudì registry. The market is split into seven bidding zones: NORD, CNOR, CSUD, SUD, CALA, SICI, SARD.

Permittingdraft

Permitting procedures and connection times for storage are not yet summarised on this page. They must be checked project by project.

Fire safetydraft

BESS are not listed in Annex I of DPR 151/2011; the guidelines (DCPREV Circular 21021/2024, Note 9467/2025) apply where a regulated activity is present, typically an oil transformer above 1 m³. For outdoor utility sites: 20 m external distance (10 m with a firewall) and a 6 m protection strip; C&I and indoor installations are not yet covered.

Taxdraft

Corporate tax IRES 24 % plus IRAP 3.9 %. 2026 super-depreciation for investments from 1 January 2026 to 30 September 2028 with GSE certification: 180 % uplift up to €2.5 M, 100 % up to €10 M, 50 % up to €20 M; a BESS paired with PV for self-consumption may qualify, a stand-alone one probably not.

Products that can be used

A product must declare CEI 0-21 for low voltage or CEI 0-16 for medium voltage; at high voltage Terna Annex A.79 applies. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.

Sources and data status

DataSourceDateStatus
Prices, spreads, negative hoursGME, Prezzo medio per fasce (PUN Index GME), mercatoelettrico.org — fonte primaria; prima ripresi da switcho.itverified
Time bandsARERA delibera 181/06 (fasce orarie)verified
Regulated chargestrasporto e-distribuzione 2026 + ASOS/ARIM quota potenza (ARERA 227/2026, 343/2026)estimated
PV yieldPVGIS 5.3, European Commission – JRCestimated
Fire safetyCircolare DCPREV 21021 del 23/12/20242024-12-23verified

Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.

A site to assess?

With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.

Calculate the offer