Great Britain (excluding Northern Ireland) · updated 1 October 2026

In Great Britain a C&I battery pays back by avoiding red-band network charges, not only on price

The distribution charge (DUoS) of NGED West Midlands is 0.0762 EUR/kWh (6.5 p) in the red band, weekdays 16:00-19:00, and 0.0012 EUR/kWh in the green band: with the other regulated charges, an LV site pays 0.146 against 0.071 EUR/kWh. The wholesale price moves less, from 127.5 EUR/MWh in red to 99.6 EUR/MWh in green (Elexon MID index, Sep 2025 - Aug 2026).

105.6 €/MWhaverage day-ahead priceElexon BMRS / Insights API · 2025-09-01..2026-08-31
71 €/MWhdaily 4-hour spread
194hours at zero or negative price
× 65DUoS unit charge, red vs green band (LV)NGED West Midlands · 2026/27

Prices over the last year

Monthly average day-ahead price, €/MWh. Real history, no forecast.

76
85
89
87
114
93
112
96
123
113
124
152
SeptOctNovDecJanFebMarAprMayJunJulAug

Average daily spread

802 hours
714 hours
548 hours

€/MWh: mean of the N most expensive hours minus the N cheapest of each day.

For commercial and industrial sites

There are no statutory time-of-use bands for the energy price: the statutory bands are the DUoS red, amber and green bands set by each DNO. In NGED West Midlands red is Mon-Fri 16:00-19:00, amber Mon-Fri 07:30-16:00 and 19:00-21:00, green the rest of the week and all weekend; bank holidays count as weekdays and other DNO areas use different hours.

Tariff band calendar

01234567891011121314151617181920212223
Weekdays
G
G
G
G
G
G
G
G
A
A
A
A
A
A
A
A
R
R
R
A
A
G
G
G
Saturday · Sunday and holidays
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
RedAmberGreen

Regulated charges by band

€/kWhBTMTEnergy
Red0.14590.09030.128
Amber0.07930.07200.111
Green0.07080.06980.100

€/kWh. Energy: average day-ahead price in the band, last year.

Power charge

The DUoS capacity charge is billed on the agreed import capacity (MIC): 45.53 EUR/kVA/year on LV and 39.55 EUR/kVA/year on HV (NGED West Midlands 2026/27), with excess capacity charged at the same rate. Fixed daily residual charges depend on MIC bands, so a battery that lowers the MIC can also move the site to a lower band.

Value of exported energy

Over the last year solar output captured 0.92 times the average market price, about 97.2 EUR/MWh, because GB has little midday price collapse (194 hours at zero or below). This is a wholesale value: Smart Export Guarantee tariffs offered to small sites are usually lower.

PV yield

1,069South
1,010 – 1,146
983Wales
933 – 1,034
980Midlands
960 – 1,020
935North
880 – 979
856Scotland
804 – 894

kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.

For utility-scale storage

Revenue streams open to a storage plant and their status.

Wholesale arbitrageactive

Half-hourly day-ahead and intraday trading; the average daily 4-hour spread was 71.05 EUR/MWh (Sep 2025 - Aug 2026).

Balancing Mechanismactive

Batteries take part as BM units, directly or through aggregators; revenues are not quantified here.

Dynamic Containment, Moderation, Regulationactive

Daily pay-as-clear auctions on NESO's EAC; average clearing prices Apr-Aug 2026 ranged from negative values (DMH, DRH) to 18.92 EUR/MW/h (DRL).

Quick, Slow and Balancing Reserveactive

Procured day-ahead on the EAC; positive products averaged 4.27-4.70 EUR/MW/h in Apr-Aug 2026.

Capacity Marketactive

T-4 2029/30 cleared at 31.71 EUR/kW/year and T-1 2026/27 at 5.85 EUR/kW/year per de-rated kW; a 2-hour battery was de-rated to 20.94 % in the 2024 set.

Embedded benefitsactive

Distribution-connected exports earn a DUoS generation credit (LV red band 0.0830 EUR/kWh in NGED West Midlands) and the TNUoS Embedded Export Tariff (6.76 EUR/kW in the Midlands zone).

Rules

Summary of public rules. It does not replace the check of a qualified professional on the specific project.

Grid codedraft

EREC G99 applies to all generation and storage in parallel with distribution networks: Type A from 0.8 kW to under 1 MW, up to Type D at 50 MW or 110 kV. Since 10 March 2025 new distribution-connected storage must also support LFSM-U; the current G99 issue number could not be confirmed.

Connection and export limitationverified

The customer applies to the DNO under G99; where export is capped or zero, an export limitation scheme under EREC G100 is required. There is no statutory LV power limit, and Ofgem's TMO4+ connections reform (15 April 2025) applies to projects that affect the transmission network.

Registers and type testingverified

There is no national self-consumption registry: the DNO keeps the connection record and publishes its Embedded Capacity Register. Inverters and PCS are normally listed on the ENA Type Test Register to speed up the application.

Storage definition and permittingdraft

Since 26 December 2023 storage is a subset of generation under the Electricity Act 1989 as amended; small sites use the generation licence exemptions (under 10 MW). Planning routes differ in England, Wales and Scotland and are summarised from secondary sources.

Fire safetydraft

There is no statutory BESS fire code: fire services apply the NFCC guidance (revised December 2025) to open-air systems of 1 MWh or more, with an initial 30 m distance to occupied buildings and 25 l/s of fire water. Indoor systems fall under Approved Document B and a fire risk assessment.

Taxverified

Corporation Tax is 25 % (19 % for small profits), and companies can deduct 100 % of new main-pool plant in the first year (full expensing). A battery built into a building may count as special-rate plant (50 % first-year allowance): this is a case-by-case judgement.

Products that can be used

A product must declare compliance with EREC G99 to be connected here (G98 covers only micro-generation up to 16 A per phase; G59 and G83 are not enough), ideally with a listing on the ENA Type Test Register. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.

Sources and data status

DataSourceDateStatus
Prices, spreads, negative hoursElexon BMRS / Insights API, Market Index Data (MID), provider APXMIDPdownloaded 2026-09-30verified
Time bandsNGED West Midlands, Schedule of charges 2026/27, Annex 1 time bands (https://www.nationalgrid.co.uk/downloads-view-reciteme/686182)verified
Regulated chargesNGED West Midlands, Schedule of charges and other tables 2026/27 (final)effective 2026-04-01verified
PV yieldPVGIS v5.3 (EU JRC) PVcalc APIqueried 2026-09-30verified
Grid codeENWL, G99 information (types A-D, storage exemptions)accessed 2026-09-30draft
Fire safetyNFCC, Grid scale energy storage system planning - guidance for fire and rescue servicesrevised 2025-12, accessed 2026-09-30draft

Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.

A site to assess?

With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.

Calculate the offer