Romania (single bidding zone) · updated 1 October 2026
In Romania a BESS pays back on the day-ahead spread: network charges are flat, with no capacity term
Regulated charges are paid per MWh only, the same at every hour and with no capacity term (about 0.092 €/kWh at LV, i.e. 0.48 lei/kWh, estimated): shifting or shaving consumption does not reduce them. The value lies in the energy price: from September 2025 to August 2026 the daily 4-hour spread averaged 140 €/MWh on a mean price of 118 €/MWh, with 292 hours at zero or negative prices.
Prices over the last year
Monthly average day-ahead price, €/MWh. Real history, no forecast.
Average daily spread
€/MWh: mean of the N most expensive hours minus the N cheapest of each day.
For commercial and industrial sites
There are no regulated time-of-use periods: transmission, system services and distribution are single-rate tariffs in lei/MWh, set by ANRE for each of the four concession DSOs, and at LV the high-, medium- and low-voltage tariffs are added up. Barrel estimate of 2026 regulated charges (mean of the 8 zones, excise excluded): 0.0918 €/kWh at LV and 0.0476 €/kWh at MV; time-of-use only appears in some supplier offers.
No statutory time bands: network charges are the same in every hour.
Power charge
Regulated network tariffs have no capacity term: 0 €/kW/year at both LV and MV (ANRE Orders 73, 74, 75–78/2025). Peak shaving has no value on network charges; only reactive energy is billed separately (about 0.20 lei/kvarh), while supply contracts may carry capacity terms that are not public.
Value of exported energy
PV sells when prices are lowest: from September 2025 to August 2026 it captured 0.612 times the average price, about 72 €/MWh against 118 €/MWh (Barrel estimate from Ember data and a PVGIS profile for Bucharest). This is before the supplier or aggregator fee, the TG injection tariff (3.63 lei/MWh) and imbalance costs.
PV yield
1,285 – 1,313
1,221 – 1,252
1,148 – 1,226
kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.
For utility-scale storage
Revenue streams open to a storage plant and their status.
OPCOM day-ahead at 15-minute resolution since 1 Oct 2025, coupled in SDAC, plus continuous intraday trading (SIDC).
Daily tenders run by Transelectrica; PICASSO and MARI go-live planned in 2026 (secondary source); prices not yet loaded.
Balancing energy with 15-minute imbalance settlement; revenues not quantified.
No capacity mechanism in Romania as of 30 Sep 2026.
First contracts signed on 17 Oct 2024 for 130.9 MWh (about €6.4 M); the later call was withdrawn (press).
€150 M for stand-alone BESS, up to €69,000 per MWh and €15 M per company, applications until 31 Dec 2030 according to a regional agency guide (draft).
Rules
Summary of public rules. It does not replace the check of a qualified professional on the specific project.
Storage has its own technical norm, ANRE Order 3/2023 (in force since 20 Jan 2023), with categories A–D and requirements that apply in charging and discharging; compliance is proven through EON/ION/FON notifications (ANRE Order 51/2019). Draft: category thresholds confirmed only by secondary sources and no ANRE list of accepted certificates.
Storage that cannot feed into the grid falls outside ANRE Order 3/2023 (reading of art. 3), but the DSO asks for an updated ATR if approved power or the connection changes. For prosumers, a law promulgated on 24 Jul 2026 raises the compensation threshold to 400 kW and allows storage (press, law number not verified).
Connection runs through the technical connection permit (ATR) and a contract with the DSO; the fee follows the ANRE Order 11/2014 methodology. From 1 Jan 2026, production sites of 5 MW or more, including those with storage, without a valid ATR obtain grid capacity through auctions (ANRE Order 53/2024).
Storage is defined in Law 123/2012; under OUG 134/2024 and ANRE Order 56/2025, energy stored and fed back is exempt from transmission, distribution and system-service tariffs, while own consumption and losses are charged. A behind-the-meter BESS charging from the grid for the site pays the site tariffs (interpretation).
No BESS-specific rule: Law 307/2006 applies, HG 571/2016 for cases needing an ISU fire permit and Normativ P118/1-2025 for buildings; containerised BESS are not listed explicitly. A fire at Stâlpu (Buzău) on 26 Aug 2026 is under investigation, with no regulatory response so far.
Profit tax 16% and VAT 21% since 1 Aug 2025. Batteries are depreciated over 8–12 years (HG 2139/2004), and OUG 8/2026 allows up to 65% in the first year for technological equipment bought in 2026; both points come from secondary sources.
Products that can be used
To be usable in Romania a product must declare compliance with ANRE Order 3/2023 (LV and MV); EN 50549-1/-2 certificates alone depend on DSO acceptance, and a hybrid PV inverter also falls under ANRE Order 208/2018. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.
Sources and data status
| Data | Source | Date | Status |
|---|---|---|---|
| Prices, spreads, negative hours | Ember, European wholesale electricity price data (hourly, Romania) | downloaded 2026-09-30 | verified |
| Regulated charges | MET Romania Energy, supplier notice of regulated tariffs from 01-01-2026 (lists Ord. ANRE 69, 73, 74, 75-78, 81/2025) (secondary) | 2025-12-22 | draft |
| PV yield | PVGIS v5.3 (EU JRC) PVcalc API | queried 2026-09-30 | verified |
| Grid code | Ord. ANRE 3/2023, Norma tehnica privind cerintele tehnice de racordare ... pentru instalatiile de stocare a energiei electrice si procedura de notificare (MO 53/19-01-2023) | 2023-01-19 | draft |
| Fire safety | Legea 307/2006 privind apărarea împotriva incendiilor | accessed 2026-09-30 | draft |
Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.
A site to assess?
With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.