barrel.centerBESS markets › Romania

Romania (single bidding zone) · updated 1 October 2026

In Romania a BESS pays back on the day-ahead spread: network charges are flat, with no capacity term

Regulated charges are paid per MWh only, the same at every hour and with no capacity term (about 0.092 €/kWh at LV, i.e. 0.48 lei/kWh, estimated): shifting or shaving consumption does not reduce them. The value lies in the energy price: from September 2025 to August 2026 the daily 4-hour spread averaged 140 €/MWh on a mean price of 118 €/MWh, with 292 hours at zero or negative prices.

118.0 €/MWhaverage day-ahead priceEmber · 2025-09-01..2026-08-31
140 €/MWhdaily 4-hour spread
292hours at zero or negative price
+31%price outside 08–20 vs 08–20Ember (ENTSO-E) · Sep 2025 – Aug 2026

Prices over the last year

Monthly average day-ahead price, €/MWh. Real history, no forecast.

97
122
121
118
150
100
105
96
110
123
120
151
SeptOctNovDecJanFebMarAprMayJunJulAug

Average daily spread

1582 hours
1404 hours
1078 hours

€/MWh: mean of the N most expensive hours minus the N cheapest of each day.

For commercial and industrial sites

There are no regulated time-of-use periods: transmission, system services and distribution are single-rate tariffs in lei/MWh, set by ANRE for each of the four concession DSOs, and at LV the high-, medium- and low-voltage tariffs are added up. Barrel estimate of 2026 regulated charges (mean of the 8 zones, excise excluded): 0.0918 €/kWh at LV and 0.0476 €/kWh at MV; time-of-use only appears in some supplier offers.

No statutory time bands: network charges are the same in every hour.

Power charge

Regulated network tariffs have no capacity term: 0 €/kW/year at both LV and MV (ANRE Orders 73, 74, 75–78/2025). Peak shaving has no value on network charges; only reactive energy is billed separately (about 0.20 lei/kvarh), while supply contracts may carry capacity terms that are not public.

Value of exported energy

PV sells when prices are lowest: from September 2025 to August 2026 it captured 0.612 times the average price, about 72 €/MWh against 118 €/MWh (Barrel estimate from Ember data and a PVGIS profile for Bucharest). This is before the supplier or aggregator fee, the TG injection tariff (3.63 lei/MWh) and imbalance costs.

PV yield

1,300Sud
1,285 – 1,313
1,237Vest
1,221 – 1,252
1,192Centru-Nord
1,148 – 1,226

kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.

For utility-scale storage

Revenue streams open to a storage plant and their status.

PZU and intraday arbitrageactive

OPCOM day-ahead at 15-minute resolution since 1 Oct 2025, coupled in SDAC, plus continuous intraday trading (SIDC).

aFRR, mFRR, FCR reservesactive

Daily tenders run by Transelectrica; PICASSO and MARI go-live planned in 2026 (secondary source); prices not yet loaded.

Balancing marketactive

Balancing energy with 15-minute imbalance settlement; revenues not quantified.

Capacity marketabsent

No capacity mechanism in Romania as of 30 Sep 2026.

PNRR grants (Investment 4.3)closed

First contracts signed on 17 Oct 2024 for 130.9 MWh (about €6.4 M); the later call was withdrawn (press).

Modernisation Fundactive

€150 M for stand-alone BESS, up to €69,000 per MWh and €15 M per company, applications until 31 Dec 2030 according to a regional agency guide (draft).

Rules

Summary of public rules. It does not replace the check of a qualified professional on the specific project.

Grid codedraft

Storage has its own technical norm, ANRE Order 3/2023 (in force since 20 Jan 2023), with categories A–D and requirements that apply in charging and discharging; compliance is proven through EON/ION/FON notifications (ANRE Order 51/2019). Draft: category thresholds confirmed only by secondary sources and no ANRE list of accepted certificates.

Self-consumptiondraft

Storage that cannot feed into the grid falls outside ANRE Order 3/2023 (reading of art. 3), but the DSO asks for an updated ATR if approved power or the connection changes. For prosumers, a law promulgated on 24 Jul 2026 raises the compensation threshold to 400 kW and allows storage (press, law number not verified).

Connectionverified

Connection runs through the technical connection permit (ATR) and a contract with the DSO; the fee follows the ANRE Order 11/2014 methodology. From 1 Jan 2026, production sites of 5 MW or more, including those with storage, without a valid ATR obtain grid capacity through auctions (ANRE Order 53/2024).

Storage definitionverified

Storage is defined in Law 123/2012; under OUG 134/2024 and ANRE Order 56/2025, energy stored and fed back is exempt from transmission, distribution and system-service tariffs, while own consumption and losses are charged. A behind-the-meter BESS charging from the grid for the site pays the site tariffs (interpretation).

Fire safetydraft

No BESS-specific rule: Law 307/2006 applies, HG 571/2016 for cases needing an ISU fire permit and Normativ P118/1-2025 for buildings; containerised BESS are not listed explicitly. A fire at Stâlpu (Buzău) on 26 Aug 2026 is under investigation, with no regulatory response so far.

Taxdraft

Profit tax 16% and VAT 21% since 1 Aug 2025. Batteries are depreciated over 8–12 years (HG 2139/2004), and OUG 8/2026 allows up to 65% in the first year for technological equipment bought in 2026; both points come from secondary sources.

Products that can be used

To be usable in Romania a product must declare compliance with ANRE Order 3/2023 (LV and MV); EN 50549-1/-2 certificates alone depend on DSO acceptance, and a hybrid PV inverter also falls under ANRE Order 208/2018. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.

Sources and data status

DataSourceDateStatus
Prices, spreads, negative hoursEmber, European wholesale electricity price data (hourly, Romania)downloaded 2026-09-30verified
Regulated chargesMET Romania Energy, supplier notice of regulated tariffs from 01-01-2026 (lists Ord. ANRE 69, 73, 74, 75-78, 81/2025) (secondary)2025-12-22draft
PV yieldPVGIS v5.3 (EU JRC) PVcalc APIqueried 2026-09-30verified
Grid codeOrd. ANRE 3/2023, Norma tehnica privind cerintele tehnice de racordare ... pentru instalatiile de stocare a energiei electrice si procedura de notificare (MO 53/19-01-2023)2023-01-19draft
Fire safetyLegea 307/2006 privind apărarea împotriva incendiiloraccessed 2026-09-30draft

Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.

A site to assess?

With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.

Calculate the offer