Mainland Portugal (excluding the Azores and Madeira) · updated 1 October 2026
In Portugal, BESS earns in the evening ponta, where grid charges are ten times the night rate
From 1 April 2027, ERSE Diretiva 3/2026 moves the ponta period to the evening (17:00-22:00 in winter, 19:30-22:30 in summer), when PV has stopped producing. On BTE the regulated charge in ponta, including the peak-hours power term, is about 0.248 €/kWh against 0.025 €/kWh in super vazio, and over the last year the OMIE price in those hours averaged 110 €/MWh against 57 in cheias.
Prices over the last year
Monthly average day-ahead price, €/MWh. Real history, no forecast.
Average daily spread
€/MWh: mean of the N most expensive hours minus the N cheapest of each day.
For commercial and industrial sites
Four ERSE periods (ponta, cheias, vazio normal, super vazio) on the weekly cycle, which from 1 April 2027 applies to MAT, AT, MT and BTE; super vazio is 02:30-06:30 every day, Saturday has no ponta and Sundays and holidays are vazio only. The 2026 access tariffs are applied to the new calendar: 2027 prices are not yet published.
Tariff band calendar
Regulated charges by band
| €/kWh | BT | MT | Energy |
|---|---|---|---|
| Ponta | 0.2482 | 0.1128 | 0.110 |
| Cheias | 0.0363 | 0.0192 | 0.057 |
| Vazio normal | 0.0295 | 0.0156 | 0.057 |
| Super vazio | 0.0247 | 0.0139 | 0.079 |
€/kWh. Energy: average day-ahead price in the band, last year.
Power charge
Two power terms: contracted power (highest 15-minute demand over the last 12 months) costs 20.55 €/kW/year on BTE, 16.72 on MT and 3.25 on AT; power in peak hours, i.e. ponta energy divided by ponta hours, costs 201.52 €/kW/year on BTE and 88.88 on MT. A battery discharging in ponta mainly reduces the second.
Value of exported energy
Between September 2025 and August 2026 PV captured 0.454 times the average OMIE price, about 30 €/MWh against an average of 66.58, with 813 hours at zero or negative prices. There is no net metering for C&I: surplus is sold through an aggregator.
PV yield
1,417 – 1,517
1,451 – 1,580
1,577 – 1,744
kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.
For utility-scale storage
Revenue streams open to a storage plant and their status.
Same market as Spain, 15-minute day-ahead since 1 October 2025; the Portuguese price split from the Spanish one in 10.3 % of quarter-hours.
aFRR, mFRR and RR procured by REN; storage licensed under Despacho 1859/2025 must take part. REN prices not yet loaded.
Mandatory offer for storage licensed under Despacho 1859/2025; on distribution grids reactive power is agreed with the operator.
DGEG: up to 750 MVA for standalone storage and 300 MVA for renewables with storage; auction announced for 14 September 2026, result not verified. Allocates grid capacity, pays no availability fee.
Planned with a dedicated battery auction of about 750 MW, pending EU state-aid approval; no auction or price as of 30 September 2026.
PRR storage call: €100 M awarded to 43 projects, about 500 MW (January 2025), for grid-scale projects.
Rules
Summary of public rules. It does not replace the check of a qualified professional on the specific project.
No national code like Italy's CEI 0-21: RfG plus Portaria 73/2020 apply, shown with a 'Portaria 73/2020 + NP EN 50549-1' (LV) or EN 50549-2 (MV) attestation. National type A-D thresholds and a list of certified inverters were not found in primary sources.
UPAC up to 30 kW by prior notice, up to 1 MW with registration and operating certificate, above 1 MW with production and operating licences (DL 15/2022, read through law-firm notes). A battery inside a UPAC pays the site's tariff.
Despacho 1859/2025 lets storage use injection capacity already allocated to renewable plants or UPAC above 1 MW, with charging power set by the grid operator. DL 130/2026 introduces non-firm access, to be regulated by ERSE.
DL 15/2022 separates autonomous storage from storage co-located with a plant or a UPAC. Storage outside self-consumption is exempt from access tariffs on energy later reinjected until the end of 2029 (ERSE regulation art. 56).
No national BESS rule. Inside buildings RT-SCIE applies: batteries above 1000 VAh in a risk C room (REI/EI 60), above 250 kW aggravated risk C (REI/EI 90); for outdoor containers applicability is unclear and projects use a risk analysis, usually based on NFPA 855.
VAT 23 %. Corporate tax (IRC) 19 % in 2026, 18 % in 2027 and 17 % from 2028, plus municipal derrama up to 1.5 %. No specific depreciation rate for batteries: the taxpayer must justify the useful life.
Products that can be used
To be usable in Portugal a product must declare the Portaria 73/2020 attestation (with NP EN 50549-1 for LV or EN 50549-2 for MV): a plain EN 50549 certificate is not enough. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.
Sources and data status
| Data | Source | Date | Status |
|---|---|---|---|
| Prices, spreads, negative hours | OMIE marginalpdbc daily files (Portuguese price, column 5) | downloaded 2026-09-30 | verified |
| Time bands | ERSE Diretiva n.º 3/2026 (2026-07-31), art. 2.4 and 2.10 | verified | |
| Regulated charges | ERSE, Tarifas e preços para a energia elétrica e outros serviços em 2026 (Diretiva n.º 1/2026), Quadro 3-27 and 3-42 | 2025-12-15 (Diretiva 1/2026 of 2026-01-07) | verified |
| PV yield | PVGIS v5.3 (EU JRC) PVcalc API | queried 2026-09-30 | verified |
| Grid code | Portaria n.º 73/2020 (RfG non-exhaustive requirements) | 2020-03-16 | draft |
| Fire safety | Portaria n.º 1532/2008 RT-SCIE as republished by Portaria n.º 135/2020 (DR 107, 2020-06-02) | 2020-06-02 | draft |
Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.