barrel.centerBESS markets › Portugal

Mainland Portugal (excluding the Azores and Madeira) · updated 1 October 2026

In Portugal, BESS earns in the evening ponta, where grid charges are ten times the night rate

From 1 April 2027, ERSE Diretiva 3/2026 moves the ponta period to the evening (17:00-22:00 in winter, 19:30-22:30 in summer), when PV has stopped producing. On BTE the regulated charge in ponta, including the peak-hours power term, is about 0.248 €/kWh against 0.025 €/kWh in super vazio, and over the last year the OMIE price in those hours averaged 110 €/MWh against 57 in cheias.

66.6 €/MWhaverage day-ahead priceOMIE marginalpdbc daily files · 2025-09-01..2026-08-31
91 €/MWhdaily 4-hour spread
813hours at zero or negative price
× 10ponta vs super vazio grid charge (BTE)ERSE 2026 · Barrel calculation

Prices over the last year

Monthly average day-ahead price, €/MWh. Real history, no forecast.

61
76
59
78
71
11
41
43
54
70
107
121
SeptOctNovDecJanFebMarAprMayJunJulAug

Average daily spread

992 hours
914 hours
768 hours

€/MWh: mean of the N most expensive hours minus the N cheapest of each day.

For commercial and industrial sites

Four ERSE periods (ponta, cheias, vazio normal, super vazio) on the weekly cycle, which from 1 April 2027 applies to MAT, AT, MT and BTE; super vazio is 02:30-06:30 every day, Saturday has no ponta and Sundays and holidays are vazio only. The 2026 access tariffs are applied to the new calendar: 2027 prices are not yet published.

Tariff band calendar

01234567891011121314151617181920212223
WeekdaysJan, Feb, Mar, Nov, Dec
VN
VN
SV
SV
SV
SV
VN
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Pt
Pt
Pt
Pt
Pt
Ch
Ch
WeekdaysApr, May, Jun, Jul, Aug, Sept, Oct
VN
VN
SV
SV
SV
SV
VN
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Pt
Pt
Pt
Ch
Ch
Saturday
VN
VN
SV
SV
SV
SV
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
Ch
Ch
Ch
Ch
Ch
Ch
Ch
Sunday and holidays
VN
VN
SV
SV
SV
SV
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
VN
PontaCheiasVazio normalSuper vazio

Regulated charges by band

€/kWhBTMTEnergy
Ponta0.24820.11280.110
Cheias0.03630.01920.057
Vazio normal0.02950.01560.057
Super vazio0.02470.01390.079

€/kWh. Energy: average day-ahead price in the band, last year.

Power charge

Two power terms: contracted power (highest 15-minute demand over the last 12 months) costs 20.55 €/kW/year on BTE, 16.72 on MT and 3.25 on AT; power in peak hours, i.e. ponta energy divided by ponta hours, costs 201.52 €/kW/year on BTE and 88.88 on MT. A battery discharging in ponta mainly reduces the second.

Value of exported energy

Between September 2025 and August 2026 PV captured 0.454 times the average OMIE price, about 30 €/MWh against an average of 66.58, with 813 hours at zero or negative prices. There is no net metering for C&I: surplus is sold through an aggregator.

PV yield

1,470Norte
1,417 – 1,517
1,510Centro
1,451 – 1,580
1,635Sul
1,577 – 1,744

kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.

For utility-scale storage

Revenue streams open to a storage plant and their status.

OMIE arbitrageactive

Same market as Spain, 15-minute day-ahead since 1 October 2025; the Portuguese price split from the Spanish one in 10.3 % of quarter-hours.

Balancing servicesactive

aFRR, mFRR and RR procured by REN; storage licensed under Despacho 1859/2025 must take part. REN prices not yet loaded.

Voltage and technical constraintsactive

Mandatory offer for storage licensed under Despacho 1859/2025; on distribution grids reactive power is agreed with the operator.

Grid injection capacity auctionsplanned

DGEG: up to 750 MVA for standalone storage and 300 MVA for renewables with storage; auction announced for 14 September 2026, result not verified. Allocates grid capacity, pays no availability fee.

Capacity marketplanned

Planned with a dedicated battery auction of about 750 MW, pending EU state-aid approval; no auction or price as of 30 September 2026.

Capex grantsclosed

PRR storage call: €100 M awarded to 43 projects, about 500 MW (January 2025), for grid-scale projects.

Rules

Summary of public rules. It does not replace the check of a qualified professional on the specific project.

Grid codedraft

No national code like Italy's CEI 0-21: RfG plus Portaria 73/2020 apply, shown with a 'Portaria 73/2020 + NP EN 50549-1' (LV) or EN 50549-2 (MV) attestation. National type A-D thresholds and a list of certified inverters were not found in primary sources.

Self-consumptiondraft

UPAC up to 30 kW by prior notice, up to 1 MW with registration and operating certificate, above 1 MW with production and operating licences (DL 15/2022, read through law-firm notes). A battery inside a UPAC pays the site's tariff.

Connection and hybridisationdraft

Despacho 1859/2025 lets storage use injection capacity already allocated to renewable plants or UPAC above 1 MW, with charging power set by the grid operator. DL 130/2026 introduces non-firm access, to be regulated by ERSE.

Storage definitionverified

DL 15/2022 separates autonomous storage from storage co-located with a plant or a UPAC. Storage outside self-consumption is exempt from access tariffs on energy later reinjected until the end of 2029 (ERSE regulation art. 56).

Fire safetydraft

No national BESS rule. Inside buildings RT-SCIE applies: batteries above 1000 VAh in a risk C room (REI/EI 60), above 250 kW aggravated risk C (REI/EI 90); for outdoor containers applicability is unclear and projects use a risk analysis, usually based on NFPA 855.

Taxdraft

VAT 23 %. Corporate tax (IRC) 19 % in 2026, 18 % in 2027 and 17 % from 2028, plus municipal derrama up to 1.5 %. No specific depreciation rate for batteries: the taxpayer must justify the useful life.

Products that can be used

To be usable in Portugal a product must declare the Portaria 73/2020 attestation (with NP EN 50549-1 for LV or EN 50549-2 for MV): a plain EN 50549 certificate is not enough. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.

Sources and data status

DataSourceDateStatus
Prices, spreads, negative hoursOMIE marginalpdbc daily files (Portuguese price, column 5)downloaded 2026-09-30verified
Time bandsERSE Diretiva n.º 3/2026 (2026-07-31), art. 2.4 and 2.10verified
Regulated chargesERSE, Tarifas e preços para a energia elétrica e outros serviços em 2026 (Diretiva n.º 1/2026), Quadro 3-27 and 3-422025-12-15 (Diretiva 1/2026 of 2026-01-07)verified
PV yieldPVGIS v5.3 (EU JRC) PVcalc APIqueried 2026-09-30verified
Grid codePortaria n.º 73/2020 (RfG non-exhaustive requirements)2020-03-16draft
Fire safetyPortaria n.º 1532/2008 RT-SCIE as republished by Portaria n.º 135/2020 (DR 107, 2020-06-02)2020-06-02draft

Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.

A site to assess?

With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.

Calculate the offer