Greece (interconnected system, including Crete) · updated 1 October 2026
In Greece storage earns on the evening ramp: from about 40 €/MWh at midday to over 160 €/MWh at 19–21 h
Between September 2025 and August 2026 the day-ahead price averaged 101.7 €/MWh, with 850 hours at zero or below and a daily 4-hour spread of 133 €/MWh; solar captured only 0.50 times the average price. For C&I customers with hourly metering, network charges on power inside the peak windows also count: at LV the distribution charge is worth about 0.144 €/kWh drawn in network peak hours (Barrel estimate).
Prices over the last year
Monthly average day-ahead price, €/MWh. Real history, no forecast.
Average daily spread
€/MWh: mean of the N most expensive hours minus the N cheapest of each day.
For commercial and industrial sites
There are no regulated energy bands, but for customers with hourly metering the network charges depend on fixed windows on working days: transmission (ΧΧΣ) on the mean of the 80 highest quarter-hours in the system peak periods (17:00 to 24:00 depending on the month), distribution (ΧΧΔ) on mean power in the network peak windows, around midday and in the evening. The other items (ΥΚΩ, ΕΤΜΕΑΡ, excise) are the same in every hour: Barrel estimate 0.0436 €/kWh at LV and 0.0217 €/kWh at MV; the calendar below approximates the windows to whole months.
Tariff band calendar
Regulated charges by band
| €/kWh | BT | MT | Energy |
|---|---|---|---|
| Αιχμή δικτύου | 0.1879 | 0.0655 | 0.097 |
| Αιχμή συστήματος | 0.0436 | 0.0217 | 0.164 |
| Εκτός αιχμής | 0.0436 | 0.0217 | 0.096 |
€/kWh. Energy: average day-ahead price in the band, last year.
Power charge
The ΧΧΣ transmission charge is 4,592 €/MW per month at MV and 5,482 €/MW per month at LV with hourly metering (RAAEY E-189/2025), i.e. 55.1 and 65.8 €/kW/year on power in the system peak periods. The ΧΧΔ distribution charge (63.789 €/kVA/year at MV and 210.139 at LV, from supplier sheets) is shown per kWh in the network peak band.
Value of exported energy
Solar sells when the price is lowest: between September 2025 and August 2026 it captured 0.50 times the average price, about 51 €/MWh against 101.7 €/MWh (Barrel estimate from Ember data and a PVGIS profile for Athens). At MV, PV plants with storage that can charge from the grid have hourly export caps, with zero export between 11:00 and 15:00.
PV yield
1,501 – 1,585
1,460 – 1,562
1,429 – 1,463
kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.
For utility-scale storage
Revenue streams open to a storage plant and their status.
HEnEx exchange, 15-minute products since 1 Oct 2025, coupled with Europe (SDAC, SIDC); 4-hour spread of 133 €/MWh over the last year.
Procured by IPTO, aFRR also through PICASSO since early 2025 according to a secondary source; prices not loaded yet.
901 MW awarded in three auctions with operating aid (average 49,748 and 47,680 €/MW/year in the first two); by January 2026 no plant was connected yet (press).
4.7 GW of standalone storage without subsidy, with connection priority (ΥΠΕΝ/ΓΔΕ/28255/1143 of 2025); about 12.2 GW of applications by March 2026.
No capacity mechanism found as of 1 Oct 2026; not verified against IPTO or RAAEY sources.
Rules
Summary of public rules. It does not replace the check of a qualified professional on the specific project.
At MV, storage must be certified to EN 50549-2 or IEC TS 62786-1/-3 (HEDNO, June 2026); at LV, attestations for Greece cite ΕΛΟΤ EN 50549-1 and RAE decision 1165/2020 on RfG requirements. Draft: no HEDNO LV text read, and RfG thresholds under review (IPTO proposal, November 2025).
MV PV plants with storage that charge from the grid have hourly export caps, zero between 11:00 and 15:00 (FEK B' 3328/2023); without grid charging, export is cut by 40 % between 07:00 and 19:00. Net metering for self-generation remains open, but its rules are not loaded.
New PV applications on the distribution network must include storage (art. 56 ν. 5299/2026, as stated by HEDNO); storage can be added to plants commissioned since 2019 (art. 11Γ ν. 4685/2020).
Governed by art. 11Δ ν. 4685/2020 and the 2025 priority regime: bond of 200,000 €/MW on the transmission system and 50,000 €/MW on the distribution network, and commissioning within 18 months of the connection offer (details from a secondary source).
For standalone category B BESS the standard environmental commitments (FEK B' 5628/2024) set 1-hour fire-rated containers 1 m apart (3 m on the door side), 30 m from other buildings, a 5 m perimeter road and a fire study approved by the Fire Service. There are no national distances for C&I behind-the-meter BESS.
Corporate tax 22 % and VAT 24 % (6 % on electricity supply). Machinery and equipment depreciate at 10 % a year, and investments aligned with the EU taxonomy can double the rate (art. 24 ν. 4172/2013).
Products that can be used
To be used in Greece a system must declare EN 50549-1 at LV and EN 50549-2 (or IEC TS 62786-1/-3) at MV; the PV part of a hybrid inverter also follows the RfG regulation (RAE 1165/2020). List of systems in the barrel.center comparator that declare the country's grid code: in preparation.
Sources and data status
| Data | Source | Date | Status |
|---|---|---|---|
| Prices, spreads, negative hours | Ember, European wholesale electricity price data (hourly, Greece) | downloaded 2026-09-30 | verified |
| Time bands | RAAEY E-144/2025 (ΠΜΖΣ 2026, FEK B' 4569/20-08-2025); distribution peak windows from PPC G22 sheet 09/2026 (secondary) | draft | |
| Regulated charges | RAAEY decision E-189/2025, transmission use-of-system charges (ΧΧΣ) of the ESMIE, FEK B' 7211/31-12-2025, in force from 01-02-2026 | 2025-12-31 | draft |
| PV yield | PVGIS v5.3 (EU JRC) PVcalc API | queried 2026-10-01 | verified |
| Grid code | HEDNO (ΔΕΔΔΗΕ), technical brochure 'Connection of PV stations combined with storage to the MV network' (June 2026): storage certified to EN 50549-2 or IEC TS 62786-1/-3; injection limits; storage mandatory in new PV applications (art. 56 ν. 5299/2026) | 2026-06 | draft |
| Fire safety | ΥΠΕΝ/ΔΙΠΑ/103448/7298, Standard Environmental Commitments (ΠΠΔ) for standalone electrochemical storage stations, category B, FEK B' 5628/10-10-2024 | 2024-10-10 | verified |
Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.
A site to assess?
With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.