Germany, DE-LU bidding zone · updated 1 October 2026

In Germany a BESS pays back on the peak: one quarter-hour sets the power charge for the whole year

German networks bill capacity on the highest 15-minute demand of the year: with Westnetz at medium voltage and above 2,500 utilisation hours, that is EUR 134.32 per kW per year. On the DE-LU day-ahead market the average 4-hour daily spread was EUR 113/MWh, and prices were at or below zero for 569 hours between September 2025 and August 2026.

99.0 €/MWhaverage day-ahead priceSMARD · 2025-09-01..2026-08-31
113 €/MWhdaily 4-hour spread
569hours at zero or negative price
134 €/kWannual MV power charge per kW of peak (≥ 2,500 h)Westnetz · price sheet 2026

Prices over the last year

Monthly average day-ahead price, €/MWh. Real history, no forecast.

84
84
102
93
110
97
99
79
98
110
105
127
SeptOctNovDecJanFebMarAprMayJunJulAug

Average daily spread

1292 hours
1134 hours
868 hours

€/MWh: mean of the N most expensive hours minus the N cheapest of each day.

For commercial and industrial sites

There are no national time-of-use periods for commercial and industrial customers: the network tariff of sites with quarter-hourly metering (RLM) has an annual power price and an energy price, switching price system at 2,500 annual utilisation hours. Time windows exist only per DSO (Hochlastzeitfenster for atypical use, § 19 (2) StromNEV); there are several hundred DSOs and the pack covers four.

No statutory time bands: network charges are the same in every hour.

Power charge

The power price is charged on the highest 15-minute peak of the year: Westnetz 2026, above 2,500 h, EUR 120.43/kW/year at low voltage and EUR 134.32/kW/year at medium voltage. The spread between DSOs is wide: at MV from 58.11 (E.DIS) to 148.05 EUR/kW/year (Netze BW).

Value of exported energy

Over the last year PV captured 0.594 times the average day-ahead price, about EUR 59/MWh against EUR 99.01/MWh, with 569 hours at zero or negative prices. Under EEG § 51 new plants receive no market premium in negative-price periods.

PV yield

994Nord
979 – 1,021
1,048Mitte
1,010 – 1,074
1,106Süd
1,064 – 1,130

kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.

For utility-scale storage

Revenue streams open to a storage plant and their status.

Day-ahead and intraday arbitrageactive

DE-LU zone, 15-minute products since 1 October 2025; average daily spread EUR 129/MWh over 2 hours and EUR 86/MWh over 8 hours (SMARD).

FCR (primary reserve)active

German settlement prices summed to EUR 144,730/MW over the year; shallow market (German demand around 580-600 MW), draft figure.

aFRR capacityactive

About EUR 127,572/MW/year upward and EUR 124,450/MW/year downward (pay-as-bid averages, capacity only), draft figure.

Capacity mechanism (StromVKG)planned

Act passed in July 2026, auctions planned for September and December 2026; the April draft effectively excluded batteries and the final text has not been read.

Network-charge exemption (§ 118 (6) EnWG)active

Grid-to-grid storage commissioned by 4 August 2029 is exempt for 20 years from network charges on stored energy; BNetzA plans new rules from 2029 (AgNes, under consultation).

EEG innovation tenders (PV + storage)active

Combined plants only, not stand-alone BESS; results not loaded.

Rules

Summary of public rules. It does not replace the check of a qualified professional on the specific project.

Grid codedraft

VDE-AR-N 4105 at low voltage, 4110 at medium, 4120 at high voltage; from 135 kW a plant certificate is required, except under the simplified NELEV route up to 500 kW and 270 kW feed-in. Draft: the VDE texts are paywalled and the transition rules of the March 2026 editions have not been read.

Self-consumption and mixed usedraft

Zero or limited feed-in is achieved with a feed-in limitation device under VDE-AR-N 4105; there is no dedicated anti-export standard. Charging from the grid a battery paired with EEG PV can compromise the payment for the stored energy: the BNetzA MiSpeL determination is announced for 1 October 2026.

Connection and registryverified

Above low voltage the network operator may charge a connection contribution (Baukostenzuschuss) to batteries too (BGH, 15 July 2025). Every grid-connected storage unit, behind the meter included, must be registered in the Marktstammdatenregister within one month of commissioning.

Permittingverified

Outside built-up areas batteries are privileged when linked to an existing renewable plant or, stand-alone, from 4 MW within 200 m of a substation (BauGB § 35 (1) no. 11 and 12). The building permit itself follows the code of each Land.

Fire safetydraft

No national BESS-specific rule: the Land building code, the permit and a project fire-protection concept agreed with the fire brigade apply. Spacing is based on the manufacturer's fire tests (UL 9540A); BVES and VdS 3856 guidance serve as good practice.

Taxverified

Corporate income taxes about 31.2 % with the average municipal multiplier; VAT 19 %. Electricity tax EUR 20.50/MWh, reduced to EUR 0.50/MWh net for manufacturing and agriculture on application; stored electricity is not taxed twice.

Products that can be used

To be usable in Germany a product must declare VDE-AR-N 4105 at low voltage and VDE-AR-N 4110 at medium voltage (4120 at high voltage). List of systems in the barrel.center comparator that declare the country's grid code: in preparation.

Sources and data status

DataSourceDateStatus
Prices, spreads, negative hoursSMARD (Bundesnetzagentur), Großhandelspreise day-ahead DE-LU, filter 4169, quarter-hour seriesdownloaded 2026-09-30verified
Regulated chargesWestnetz GmbH, Preisblätter Netzentgelte Strom gültig ab 01.01.20262026-01-01verified
PV yieldPVGIS v5.3 (EU JRC) PVcalc APIqueried 2026-09-30verified
Grid codeVDE FNN Hinweis 'Vereinfachter Anschluss und Nachweis von Erzeugungsanlagen und Speichern (NELEV-Novelle 2024, EAAV)' v1.02024-03draft
Fire safetyTÜV Nord, Brandschutz für Superakkus (no BESS-specific German fire rules)accessed 2026-09-30draft

Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.

A site to assess?

With the customer's load curve, Barrel's BESS connector simulates the site hour by hour, sizes the battery and prepares the offer under your brand.

Calculate the offer