Poland, single bidding zone; TAURON Dystrybucja 2026 network tariffs · updated 1 October 2026
In Poland a battery earns by moving consumption out of the 07-22 weekday window of the capacity fee
The capacity fee (opłata mocowa) costs 50.2 EUR/MWh (219.40 zł/MWh) on energy drawn from 07:00 to 22:00 on working days, multiplied by a factor from 0.17 to 1 that falls as in-window consumption gets closer to off-window consumption. The day-ahead afternoon peak sits in the same window: 182.9 EUR/MWh against 102.8 EUR/MWh in the other hours.
Prices over the last year
Monthly average day-ahead price, €/MWh. Real history, no forecast.
Average daily spread
€/MWh: mean of the N most expensive hours minus the N cheapest of each day.
For commercial and industrial sites
At medium voltage the TAURON B23 tariff has three zones: morning peak 07-13 on working days, afternoon peak 19-22 from April to September and 16-21 from October to March, and the remaining hours; weekends and holidays are all off-peak. At low voltage group C21 has a single network rate; other DSOs (PGE, Enea, Energa) are not yet loaded.
Tariff band calendar
Regulated charges by band
| €/kWh | BT | MT | Energy |
|---|---|---|---|
| Szczyt przedpołudniowy | 0.0855 | 0.0476 | 0.112 |
| Szczyt popołudniowy | 0.0855 | 0.0490 | 0.183 |
| Pozostałe godziny | 0.0655 | 0.0248 | 0.103 |
€/kWh. Energy: average day-ahead price in the band, last year.
Power charge
The fixed network component is charged on contracted power (moc umowna): 48.12 EUR/kW/year at low voltage (C21) and 51.58 EUR/kW/year at medium voltage (B23), TAURON 2026 tariff. A battery that lowers moc umowna reduces this item; exceedance charges are not loaded.
Value of exported energy
Over the last year PV captured 0.611 times the average day-ahead price, about 69.4 EUR/MWh against 113.6 EUR/MWh, with 322 hours at zero or negative prices. Installations up to 50 kW are on net-billing at the RCE market price; larger ones sell surplus under a contract.
PV yield
997 – 1,052
1,014 – 1,051
1,054 – 1,081
kWh/kWp per year, PVGIS 5.3, 30° tilt, south, 14 % losses.
For utility-scale storage
Revenue streams open to a storage plant and their status.
15-minute market since 1 Oct 2025; average daily spread Sep 2025 – Aug 2026: 145 EUR/MWh over 2 hours, 124 over 4, 92 over 8.
Reform in force since 14 Jun 2024 with daily procurement of capacity; PSE accession to MARI documented on 9 Apr 2026. Prices and storage prequalification not yet loaded.
Main auction for delivery 2030 (11 Dec 2025): 465.02 zł/kW/year, about 106 EUR, for 6,888 MW; contracts up to 17 years for new units.
Down to 13.39 % for 2030 from about 60 % in 2029 and 95 % in 2028 (secondary source): per nameplate kW the 2030 auction is worth about 62 zł/kW/year.
NFOŚiGW Modernisation Fund: 3.731 bn zł in 171 grant agreements; KPO call G1.1.3 closed in March 2025. No 2026 call for behind-the-meter C&I storage.
Successor storage programme in preparation; budget and dates not published.
Rules
Summary of public rules. It does not replace the check of a qualified professional on the specific project.
NC RfG through the PSE requirements (WOS), with a certificate under the PTPiREE rules and the Bank Nastaw dla Polski settings table: a generic EN 50549 certificate is not enough. The 2025 revision becomes mandatory for all types from 1 Jan 2027 and the storage test procedure was in consultation until 27 Aug 2026 (secondary sources).
Storage pays one half of the actual connection costs and from 30 Apr 2026 counts in cable pooling (secondary summary of the law). Rules for a battery charged from and discharged to the grid inside a prosumer site are not yet checked.
Up to 50 kW no obligation; from 50 kW to 10 MW entry in the storage register kept by the system operator; above 10 MW a URE licence (Energy Law art. 32).
Up to 30 kWh no formality; 30 to 300 kWh notification; stand-alone 300 to 2,000 kWh without a permit but with a design agreed by a fire expert; above 2,000 kWh building permit (Dz.U. 2025 poz. 1847).
No BESS-specific national rule: above 30 kWh a fire-expert agreement and a notice to the State Fire Service (PSP) are needed. The new technical conditions (WT 2026, 20 m from buildings and forest) are still a draft.
Corporate income tax 19 % (9 % for small taxpayers), VAT 23 %. Stationary batteries depreciate at 20 % a year; the line for PCS and transformers is for the customer's tax adviser.
Products that can be used
A product is usable in Poland if it declares an NC RfG certificate under the PTPiREE rules (WOS PSE, Bank Nastaw dla Polski), not only EN 50549. List of systems in the barrel.center comparator that declare the country's grid code: in preparation.
Sources and data status
| Data | Source | Date | Status |
|---|---|---|---|
| Prices, spreads, negative hours | SMARD.de Großhandelspreise, Marktpreis Polen (filter 257), quarter-hour series | downloaded 2026-09-30 | verified |
| Time bands | TAURON Dystrybucja tariff 2026 pt. 2.2 (URE-approved 17-12-2025); ustawa z 18 stycznia 1951 o dniach wolnych od pracy (https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU19510040028) | verified | |
| Regulated charges | TAURON Dystrybucja S.A., Taryfa dla usług dystrybucji energii elektrycznej na rok 2026 (URE decision DRE.WRE.4211.54.8.2025.ASa1, 17-12-2025) | 2025-12-17, downloaded 2026-09-30 | estimated |
| PV yield | PVGIS v5.3 (EU JRC) PVcalc API | queried 2026-09-30 | verified |
| Grid code | TAURON Dystrybucja S.A., Taryfa dla usług dystrybucji energii elektrycznej na rok 2026 (URE decision DRE.WRE.4211.54.8.2025.ASa1, 17-12-2025) | 2025-12-17, downloaded 2026-09-30 | draft |
| Fire safety | Ustawa z 4 grudnia 2025 o zmianie ustawy Prawo budowlane (Dz.U. 2025 poz. 1847) | published 2025-12-29 | draft |
Data from the public sources cited. 'Verified' means a primary source, 'draft' a secondary source or a rule not read in full. Not advice: a project needs the site's and the contract's data.